What would a new school look like?

Potential design options for the school will be studied and reviewed during the Feasibility Study process. The MSBA requires that the Belmont High School Building Committee review options for addition/renovation to the existing building, as well as new construction on the existing site. The Belmont High School Building Project has also received approval from the MSBA to study options for multiple grade configurations (9-12, 8-12, and 7-12). The grade configuration, size of school, and scope of project will help determine the design of the school building.